Tập tin:Governor Cooper Celebrates New Section of Interstate 73 (35068226521).jpg

Nội dung trang không được hỗ trợ ở ngôn ngữ khác.
Tập tin này từ Wikimedia Commons
Bách khoa toàn thư mở Wikipedia

Tập tin gốc(5.184×3.456 điểm ảnh, kích thước tập tin: 1,69 MB, kiểu MIME: image/jpeg)

Miêu tả

Miêu tả

GREENSBORO– In front of a crowd of community supporters, business leaders and state and local elected officials, Governor Roy Cooper touted a new 9.4-mile section of Interstate 73 as one of the most important transportation projects of the last two decades in the Triad.


“Interstate connections bring mobility, economic development, job creation and improved quality of life,” said Governor Roy Cooper. “We are already seeing how this new highway is contributing to economic growth here in the Triad region, with more than $235 million in investment planned along the corridor.”


Governor Cooper, Transportation Secretary Jim Trogdon and Board of Transportation Chair Michael Fox celebrated the project during a formal ribbon cutting ceremony on Friday, June 9.


The new section of interstate runs from the Joseph M. Bryan Boulevard/Airport Parkway interchange in Greensboro, crosses over N.C. 68 and ends south of U.S. 220 near the Haw River. The project’s contract cost $176.5 million, and included construction of a taxiway bridge at PTI Airport that is expected to spur development by providing runway access to more than 800 acres.


“A lot of collaboration went into seeing this project to completion. It has long been Rockingham County’s number one priority, as well as a top priority for Guilford County,” Secretary Trogdon said. “It would not have been possible without a collective effort.”


The roadway was completed two years earlier than originally scheduled by combining two sections of the project into a single design-build contract. In addition to the accelerating the project’s timeline, the design-build method lessens environmental impacts and saves taxpayer money by avoiding cost inflation.


“This new route cuts commutes in half and increases safety for drivers,” said Board of Transportation Chair Michael Fox. “It provides a new route without intersections and red lights, and reducing those potential collision points saves lives.”


I-73 is eventually slated to run from South Carolina to Michigan, tying North Carolina into a national effort to improve north-south travel for much of the country.


All lanes of the new section are expected to open to traffic in July. The 6-mile section of I-73 connecting U.S. 220 and N.C. 68 opened to traffic on May 19. For more about the project, including maps and pictures click here.


Local business and government leaders had the following to say about the project and its impact:


“We see I-73 as a major shot in the arm to our economic development efforts,” said Jan Critz, president of the Rockingham County Center for Economic Development, Small Business and Tourism. “During the initial construction phase alone, this project created about 200 jobs in Rockingham County, and it provides better access to the nearly 3,500 jobs found at nearby businesses such as Honda Jet and Timco.”


“It’s a crucial link to hundreds of acres owned by the Authority, and enables outstanding flexibility with respect to the size and shapes of sites that we have to offer to prospective companies,” said PTIA Executive Director Kevin Baker. “I believe that history will reflect upon the completion of this connection as a critical milestone in the life of this airport, and the growing role of this region and the State of North Carolina in the aerospace industry.”


“An impressive road network like this one gives visitors, whether Furniture Market attendees or tourists, better access to High Point and Greensboro,” said High Point Economic Development Corporation President Loren Hill.


“The Town of Oak Ridge is excited about this project, which will reduce bottlenecking on N.C. 68 through our town,” added Oak Ridge Town Manager Bruce Oakley.
Ngày
Nguồn gốc Governor Cooper Celebrates New Section of Interstate 73
Tác giả NCDOTcommunications

Giấy phép

w:vi:Creative Commons
ghi công
Tập tin này được phát hành theo Giấy phép Creative Commons Ghi công 2.0 Chung.
Bạn được phép:
  • chia sẻ – sao chép, phân phối và chuyển giao tác phẩm
  • pha trộn – để chuyển thể tác phẩm
Theo các điều kiện sau:
  • ghi công – Bạn phải ghi lại tác giả và nguồn, liên kết đến giấy phép, và các thay đổi đã được thực hiện, nếu có. Bạn có thể làm các điều trên bằng bất kỳ cách hợp lý nào, miễn sao không ám chỉ rằng người cho giấy phép ủng hộ bạn hay việc sử dụng của bạn.
Hình này, ban đầu được tải lên tại Flickr bởi NCDOTcommunications vào https://flickr.com/photos/39320593@N03/35068226521. Tập tin đã được FlickreviewR 2 kiểm tra vào 23 tháng 7 năm 2020 và xác nhận rằng nó tuân theo các điều khoản của cc-by-2.0.

23 tháng 7 năm 2020

Chú thích

Ghi một dòng giải thích những gì có trong tập tin này

Khoản mục được tả trong tập tin này

mô tả

Lịch sử tập tin

Nhấn vào ngày/giờ để xem nội dung tập tin tại thời điểm đó.

Ngày/giờHình xem trướcKích cỡThành viênMiêu tả
hiện tại04:38, ngày 23 tháng 7 năm 2020Hình xem trước của phiên bản lúc 04:38, ngày 23 tháng 7 năm 20205.184×3.456 (1,69 MB)RandomUserGuy1738Transferred from Flickr via #flickr2commons
Có 1 trang tại Wikipedia tiếng Việt có liên kết đến tập tin (không hiển thị trang ở các dự án khác):

Đặc tính hình